Part of the turbines at Lake Turkana Wind Power farm at Sarima, near Lake Turkana in Laisamis, Marsabit County on March 15, 2017. [File, Standard]
The High Court has ordered the Ministry of Energy to make all power projects underway in Marsabit County public.
This is the second such directive after the ministry failed to honour a similar order by the ombudsman.